Infraly, LLC - Notice history

Experiencing partially degraded performance

Notice history

May 2025

Infraly - Chicago - Emergency Network Maintenance - May 20th, 2025
  • Completed
    May 20, 2025 at 6:08 PM
    Completed
    May 20, 2025 at 6:08 PM

    Cleanup work has been completed, and we are exiting this emergency maintenance period. We will continue to monitor over the next few hours, and if anything comes up, we will make adjustments.

    Thank you again for your understanding, and we apologize sincerely for the short notice. Our goal is always to provide stable and reliable services and this maintenance was necessary to ensure that happens.

  • Update
    May 20, 2025 at 5:53 PM
    In progress
    May 20, 2025 at 5:53 PM

    We have achieved what we needed and wanted to get done, and have been in the final cleanup stage before marking this as complete. Will update when all clear shortly.

  • Update
    May 20, 2025 at 5:15 PM
    In progress
    May 20, 2025 at 5:15 PM

    Our network team is almost done with this maintenance. We will continue to provide updates.

  • Update
    May 20, 2025 at 4:55 PM
    In progress
    May 20, 2025 at 4:55 PM

    Our network team is continuing to make progress. We are prepping changes that may have an impact in the coming minutes on certain ISP ports on our spines.

  • Update
    May 20, 2025 at 3:55 PM
    In progress
    May 20, 2025 at 3:55 PM

    VRRP changeover occurred. We are just pending lingering traffic traversing over edge1 currently to move to edge0. We will continue to provide updates.

  • Update
    May 20, 2025 at 3:31 PM
    In progress
    May 20, 2025 at 3:31 PM

    For insight, all Tier 1 and Neoprotect-routed prefixes moved traffic seamlessly as expected with metric changes. Path-routed prefixes saw a disruption in moving traffic as the metric changes applied were not being accepted, and thus resulted in a brief disruption.

    We are now altering our Virtual Router Redundancy Protocol (VRRP) priorities for IP subnets on our edge routers to alleviate impacts that we do on non-primary devices throughout the maintenance.

    We will continue to provide updates.

  • In progress
    May 20, 2025 at 2:00 PM
    In progress
    May 20, 2025 at 2:00 PM
    Maintenance is now in progress
  • Planned
    May 20, 2025 at 2:00 PM
    Planned
    May 20, 2025 at 2:00 PM

    Dear user,

    Please refer to a very important maintenance announcement that may have an impact on hosting services:

    Infraly - Chicago - Emergency Network Maintenance – May 20th, 2025

    Services Affected: Chicago, Illinois Data Center
    Start Date: May 20th, 2025 @ 14:00 UTC
    Estimated End Date: May 20th, 2025 @ 17:30 UTC

    Summary: Following the network outage that occurred during the late evening of May 18th, we are performing emergency maintenance to implement preventative measures and improve infrastructure reliability. We understand the short notice and sincerely apologize, but this work is necessary to ensure a more stable environment for all users.

    Impact on Customer: During this window, our network team will make core-level changes. While we aim to minimize disruption, brief connectivity blips may occur. We appreciate your patience and understanding.

    Updates: We will provide updates via our status page throughout the maintenance. You can subscribe for alerts on our status page (https://status.infraly.co).

    If you have any questions, don't hesitate to contact our client relations team via support ticket. Thank you again for your cooperation and support!

    Sincerely,

    Infraly, LLC DBA Hosturly, Physgun, WISP, & Buildurly
    a: 1636 N Cedar Crest Blvd, #122, Allentown, PA 18104, USA
    e: hello@infraly.co
    p: +1 (833) INF-RALY
    w: infraly.co / hosturly.com / physgun.com / wisp.gg / buildurly.com

WISP - General Maintenance – May 20th, 2025
  • Completed
    May 20, 2025 at 7:00 PM
    Completed
    May 20, 2025 at 7:00 PM
    Maintenance has completed successfully.
  • Update
    May 20, 2025 at 2:00 PM
    In progress
    May 20, 2025 at 2:00 PM

    We’re still turning up some instances, but will message when all clear and they are online and operational. Please note the new location capacity will be turned up throughout the day.

  • In progress
    May 20, 2025 at 12:00 PM
    In progress
    May 20, 2025 at 12:00 PM
    Maintenance is now in progress
  • Planned
    May 20, 2025 at 12:00 PM
    Planned
    May 20, 2025 at 12:00 PM

    Dear user,

    Please refer to a very important maintenance announcement that may have an impact on hosting services:

    WISP - General Maintenance – May 20th, 2025

    Services Affected: WISP Front-end Services
    Start Date: May 20th, 2025 @ 12:00 UTC
    Estimated End Date: May 20th, 2025 @ 14:00 UTC

    Summary: Our team will perform changes to the infrastructure of WISP to further improve performance, reliability, and capability by activating our new London and Singapore locations.

    Impact on Customer: As new locations go live, front-end services will begin using geo-routing to connect users to the closest available location. During this transition, you may notice temporary connection inconsistencies. This change does not affect game servers - WISP daemons will continue to operate as usual without interruption.

    Updates: We will provide updates via our status page throughout the maintenance. You can subscribe for alerts on our status page (https://status.infraly.co).

    If you have any questions, don't hesitate to contact our client relations team via support ticket. Thank you again for your cooperation and support!

    Sincerely,

    Infraly, LLC DBA Hosturly, Physgun, WISP, & Buildurly
    a: 1636 N Cedar Crest Blvd, #122, Allentown, PA 18104, USA
    e: hello@infraly.co
    p: +1 (833) INF-RALY
    w: infraly.co / hosturly.com / physgun.com / wisp.gg / buildurly.com

Infraly - Chicago – Partial Network Outage
  • Resolved
    Resolved

    All impacted services have been operational for 4+ hours now. We will be providing a detailed post-mortem for this incident later this week, following internal discussions with management and our network team.

    This is the most widespread/impactful outage we've ever experienced as a company, so transparency and ensuring customers are fully aware of what happened, why it happened, what we did to fix, and further prevent it from happening again are a top priority.

    We sincerely apologize for any inconvenience this incident has caused.

  • Monitoring
    Monitoring

    The majority of impacted services are operational at this time. We do still have a limited number of machines (less than 40) that are experiencing issues still. We are still working on this and will provide updates as soon as possible.

  • Update
    Update

    We are continuing to investigate route instability isolated to our Chicago location. The issue is stemming from communication inconsistencies between our edge routers at the spine layer. This is resulting in frequent route flapping and intermittent disruptions in traffic flow.

    Our network engineering team is working to rebalance route propagation and mitigate further impact. We'll continue to provide additional updates as soon as possible.

  • Update
    Update

    Our network team is still working on this issue. We will share information when we are able to do so.

  • Investigating
    Investigating

    We are currently investigating this incident. This is only affecting certain traffic landing on edge0.

Infraly - Chicago – Partial Network Outage
  • Resolved
    Resolved

    We will be posting a detailed post-mortem regarding this incident later this week. We have internal meetings with our network engineers as well as Zayo this week to discuss this incident and the exact failures on Zayo's end.

  • Monitoring
    Monitoring

    Following this unprecedented event, all carrier connections have come online without issues and are traversing traffic with healthy throughput checks. We will continue to monitor over the next few hours. Please stay tuned for the post-mortem, as that will be coming with additional information on this incident. Thank you again for your patience and understanding.

  • Update
    Update

    We have been monitoring our connections and see that all failed connections are online and operational now. We will begin turning up these connections now.

  • Update
    Update

    Zayo has given us an estimated restoration time of 6:00 am CT. Upon restoration of our fiber ring (connection to 350 E Cermak and another connection to 427 La Salle), our additional carrier connections will restore themselves and alleviate congestion on existing on-net carrier connections from Comcast and Lumen. We will provide updates ASAP.

  • Update
    Update

    For transparency, only Comcast and Lumen on-net connections are traversing traffic at this moment, with heavy congestion in the Chicago area.

  • Update
    Update

    We have complete confirmation that our Zayo fiber ring is completely broken now. Runs from our West Chicago facility to 350 E Cermak and West Chicago to 427 La Salle St are offline. Only connections available are our on-net connections, but these are heavily congested due to the limited capacity that carriers have themselves, due to the fiber ring issues with Zayo.

  • Update
    Update

    We're seeing heavy congestion currently on available uplinks. This suggests more fiber paths have been impacted on Zayo's end. We can confirm we have a complete outage on one of our fiber ring connections to downtown. We will provide an update ASAP.

  • Identified
    Identified

    We're seeing more instability on more dark fiber paths, which is causing a deeper impact on services. We are currently evaluating the situation as several Zayo fiber paths have failed now.

  • Monitoring
    Monitoring

    Route changes were made for the lingering packet loss issues impacting some connections. This should clear up most connections. We are still awaiting updates from Zayo.

  • Update
    Update

    As our investigation suggested, Zayo confirmed they are encountering fiber issues on paths that carry some of our Tier 1 carrier connections. We will provide updates as we receive them from Zayo. Our network team is working on any lingering issues at the current moment.

  • Identified
    Identified

    Our network team has been working on this to restore any prefixes with special routing requests. We believe this to be a dark fiber cut on Zayo's network that we haul in some connections on that are impacting upstream ports.

  • Investigating
    Investigating
    We are currently investigating this incident.

Apr 2025

Infraly - Chicago Partial Blip
  • Resolved
    Resolved

    Traffic has been traversing the network over the past 24 hours without issues. As a result, we are marking this as resolved

  • Monitoring
    Monitoring

    The cables have been replaced, and the network is traversing traffic as expected. We will continue to monitor logs over the next 24 hours for interface errors. As stated previously, we sincerely apologize for any inconvenience this incident has caused.

  • Update
    Update

    We currently have someone on-site who is prepping these changes. Please note that this is expected to occur in the next 15 minutes.

  • Update
    Update

    As promised in our previous message, we will be performing replacements of these DACs with backups from our storage at an off-peak time. This is scheduled to occur at 10:00 UTC on Wednesday, April 30th. We will provide an update when this is completed.

  • Update
    Update

    Our network team has concluded the investigation, and we have determined the root cause to be failing direct attached copper (DAC) cables between our spines and edge routers. Due to the severity of failing cables, the impact was felt more drastically throughout the network. As a result, we plan to replace the failing cables in the early morning of Wednesday, April 30th, at off-peak hours to minimize disruptions. We will provide a time for this in the coming hours. We apologize for any inconvenience this incident has caused.

  • Identified
    Identified

    Our network team is investigating deeper, but we can confirm that one of our core spine switches flapped all LACP interfaces. Physical interfaces remained online.

    The flapping of the LACP interfaces caused some connections between our top-of-rack switches and carriers to flap that were connected to said spine switch. More info will be posted soon.

  • Investigating
    Investigating

    We are currently investigating this incident and will report back once we have more details.

Hosturly - Legacy CHI-P-VPS-1 Hardware Failure
  • Resolved
    Resolved

    CHI-P-VPS-1 is now fully operational following the successful installation of a new motherboard. All virtual machines are online and functioning as expected. This incident is now considered resolved. As this event qualifies for SLA credit, we have proactively credited affected accounts with three months of additional service free of charge. This exceeds our SLA requirements, and we’ve done so as a gesture of goodwill and to reaffirm our commitment to providing reliable service and going above and beyond for our customers. We appreciate your patience and understanding.

  • Update
    Update

    A technician has replaced the suspected failed hardware. Unfortunately, the replacement is showing the same signs of failure. Due to this being legacy hardware, we have scaled down our backups as we no longer use these systems in any other production environment. Our systems team has ordered the replacement part and is expected to be delivered tomorrow, May 1st, 2025. Upon delivery, we will perform another replacement.

  • Identified
    Identified

    Our team has concluded that this is due to hardware failure. We are currently awaiting a technician to replace the motherboard and get this back in production. We will provide updates as soon as possible.

  • Investigating
    Investigating

    At 19:14 UTC, our monitoring systems have detected an outage on one of our legacy CHI-P-VPS-1 machines. Our team is currently investigating.

Infraly - London - Outage
  • Resolved
    Resolved

    Traffic has been stable for several days now. As a result, we will be marking this as resolved. We very much appreciate your understanding and apologize for any inconvenience this incident may have caused.

  • Monitoring
    Monitoring

    Services have been stable and online after the facility completed changes on our fiber connections. We will continue to monitor.

  • Update
    Update

    We're still working with datacenter staff on-site. We will provide an update ASAP.

  • Investigating
    Investigating

    We are currently investigating an issue in our London location this morning. DC engineers are already working on this.

  • Resolved
    Resolved

    Traffic has been stable for 12+ hours. As a result, we will be marking this as resolved. We very much appreciate your understanding and apologize for any inconvenience this incident may have caused.

  • Monitoring
    Monitoring

    Following an investigation with the datacenter manager on-site, we have concluded this to be a bad patch panel box that contains all of our fiber connections from carriers.

    In light of this finding, the datacenter has replaced the patch panel box and all optics connected to our core devices. We hope this will resolve any outages we have experienced today. We will continue to monitor over the next 24 hours. If this does recur, the datacenter has reassured us that there will be technical staff on-site who will be able to take actions to bring connections back up.

  • Update
    Update

    We have detected another drop in our London facility. The datacenter manager is continuing to work on this and doing tests now that this second drop has occurred unexpectedly. We will provide an update shortly.

  • Update
    Update

    Service was restored just a few minutes ago after the datacenter completed work on their end. We are currently awaiting information from them and are investigating with our own systems.

  • Update
    Update

    Our inquiry with the facility is being handled directly with the datacenter site manager. We will provide more information as soon as possible.

  • Update
    Update

    We are actively communicating with the facility in London, and this incident is marked in their systems as a high-priority 1 issue. We will provide more information as soon as possible.

  • Investigating
    Investigating

    We are currently investigating this incident. It appears to be an issue at the DC itself. Currently awaiting communications from them.

Mar 2025

Physgun - General Maintenance – March 26th, 2025
  • Completed
    March 26, 2025 at 4:28 PM
    Completed
    March 26, 2025 at 4:28 PM

    The machine is back online. We will continue to monitor. You should now be able to control your game servers via the control panel. If you have any questions or concerns, reach out to support! :)

  • Update
    March 26, 2025 at 4:26 PM
    In progress
    March 26, 2025 at 4:26 PM

    The machine has been upgraded. The system is now booting.

  • In progress
    March 26, 2025 at 4:00 PM
    In progress
    March 26, 2025 at 4:00 PM
    Maintenance is now in progress
  • Update
    March 26, 2025 at 4:00 PM
    Planned
    March 26, 2025 at 4:00 PM

    This has been changed to begin at 16:00 UTC to better allow the on-site technician proper time to get prepared.

  • Planned
    March 26, 2025 at 4:00 PM
    Planned
    March 26, 2025 at 4:00 PM

    Dear user,

    Please refer to a very important maintenance announcement that may have an impact on hosting services:

    Physgun - General Maintenance – March 26th, 2025

    Services Affected: CHI-S-GAME-2
    Start Date: March 26th, 2025 @ 16:00 UTC
    Estimated End Date: March 26th, 2025 @ 16:30 UTC

    Summary: Our team will perform upgrades to CHI-S-GAME-2 to further improve performance, reliability, and capability.

    Impact on Customer: Game servers on CHI-S-GAME-2 will be powered down as we will be deracking the machine and upgrading the components. Once upgraded, game servers will be controllable via the game panel. To find out if you are on this machine, please refer to the game panel.

    Updates: We will provide updates via our status page throughout the maintenance. You can subscribe for alerts on our status page (https://status.infraly.co).

    If you have any questions, don't hesitate to contact our client relations team via support ticket. Thank you again for your cooperation and support!

    Sincerely,

    Infraly, LLC DBA Hosturly, Physgun, WISP, & Buildurly
    a: 1636 N Cedar Crest Blvd, #122, Allentown, PA 18104, USA
    e: hello@infraly.co
    p: +1 (833) INF-RALY
    w: infraly.co / hosturly.com / physgun.com / wisp.gg / buildurly.com

WISP – General Maintenance – March 22nd, 2025
  • Completed
    March 22, 2025 at 8:00 PM
    Completed
    March 22, 2025 at 8:00 PM
    Maintenance has completed successfully
  • In progress
    March 22, 2025 at 7:00 PM
    In progress
    March 22, 2025 at 7:00 PM
    Maintenance is now in progress
  • Planned
    March 22, 2025 at 7:00 PM
    Planned
    March 22, 2025 at 7:00 PM

    Dear user,

    Please refer to a very important maintenance announcement that may have an impact on hosting services:

    WISP - General Maintenance – March 22nd, 2025

    Services Affected: WISP Front & Back-end Services
    Start Date: March 22nd, 2025 @ 19:00 UTC
    Estimated End Date: March 22nd, 2025 @ 20:00 UTC

    Summary: Our team will perform changes to the infrastructure of WISP to further improve performance, reliability, and capability.

    Impact on Customer: We do not anticipate disruptions; however, we have scheduled this out of an abundance of caution and transparency. Please note that game servers are not affected - WISP daemons will continue to operate.

    Updates: We will provide updates via our status page throughout the maintenance. You can subscribe for alerts on our status page (https://status.infraly.co).

    If you have any questions, don't hesitate to contact our client relations team via support ticket. Thank you again for your cooperation and support!

    Sincerely,

    Infraly, LLC DBA Hosturly, Physgun, WISP, & Buildurly
    a: 1636 N Cedar Crest Blvd, #122, Allentown, PA 18104, USA
    e: hello@infraly.co
    p: +1 (833) INF-RALY
    w: infraly.co / hosturly.com / physgun.com / wisp.gg / buildurly.com

Infraly - Chicago - Preparation for edge0 Replacement
  • Completed
    March 18, 2025 at 4:21 PM
    Completed
    March 18, 2025 at 4:21 PM

    Our network team is hands-off for the day. No disruption occurred. We will be posting a maintenance post for when we anticipate replacing edge0 completely. :)

  • In progress
    March 18, 2025 at 2:30 PM
    In progress
    March 18, 2025 at 2:30 PM
    Maintenance is now in progress
  • Planned
    March 18, 2025 at 2:30 PM
    Planned
    March 18, 2025 at 2:30 PM

    Dear user,

    Please refer to a very important maintenance announcement that may have an impact on hosting services:

    Preparation for edge0 Replacement – March 18th, 2025

    Services Affected: Chicago, Illinois Data Center
    Start Date: March 18th, 2025 @ 14:30 UTC
    Estimated End Date: March 18th, 2025 @ 18:30 UTC

    Summary: Preparing for the replacement of edge0, one of our routers that was deprioritized from traversing traffic in a previous maintenance post due to slowly dying resulting in infrequent blips.

    Impact on Customer: During this time, our network team will be applying changes to our network core to prepare for the replacement of edge0. Please note that there is an expected blip to occur at least once during this maintenance.

    Updates: We will provide updates via our status page throughout the maintenance. You can subscribe for alerts on our status page (https://status.infraly.co).

    If you have any questions, don't hesitate to contact our client relations team via support ticket. Thank you again for your cooperation and support!

    Sincerely,

    Infraly, LLC DBA Hosturly, Physgun, WISP, & Buildurly
    a: 1636 N Cedar Crest Blvd, #122, Allentown, PA 18104, USA
    e: hello@infraly.co
    p: +1 (833) INF-RALY
    w: infraly.co / hosturly.com / physgun.com / wisp.gg / buildurly.com

Infraly - Global - Path-Routed Services - Packet Loss
  • Resolved
    Resolved

    At 19:48 UTC on March 16th, 2025, we received the all-clear from Path that GTT had completed their maintenance. Since then, there have been no issues with connections. We will continue to monitor as always.

  • Update
    Update

    Path has notified us that one of their upstreams, GTT, is performing emergency maintenance to hopefully correct the issues previously mentioned in this incident post. This maintenance will begin at 15:45 UTC today and is expected to end at 19:45 UTC. Please note that there may be a blip in connectivity for Path-routed services that traverse the PoPs undergoing maintenance.

  • Update
    Update

    Path has notified us that one of their upstreams, GTT, is performing emergency maintenance to hopefully correct the issues previously mentioned in this incident post. This maintenance will begin at 6:00 UTC today and is expected to end at 7:00 UTC. Please note that there may be a blip in connectivity for Path-routed services that traverse the PoPs undergoing maintenance.

  • Identified
    Identified

    We are aware of issues currently with Path-routed services worldwide. We are currently in communication with them as this is outside of our control. Please note that no protection offering is perfect when not controlled by us: Path and Neoprotect both encountered similar issues today.

Mar 2025 to May 2025