Apr 2025

Infraly - Chicago Partial Blip
  • Resolved
    Resolved

    Traffic has been traversing the network over the past 24 hours without issues. As a result, we are marking this as resolved

  • Monitoring
    Monitoring

    The cables have been replaced, and the network is traversing traffic as expected. We will continue to monitor logs over the next 24 hours for interface errors. As stated previously, we sincerely apologize for any inconvenience this incident has caused.

  • Update
    Update

    We currently have someone on-site who is prepping these changes. Please note that this is expected to occur in the next 15 minutes.

  • Update
    Update

    As promised in our previous message, we will be performing replacements of these DACs with backups from our storage at an off-peak time. This is scheduled to occur at 10:00 UTC on Wednesday, April 30th. We will provide an update when this is completed.

  • Update
    Update

    Our network team has concluded the investigation, and we have determined the root cause to be failing direct attached copper (DAC) cables between our spines and edge routers. Due to the severity of failing cables, the impact was felt more drastically throughout the network. As a result, we plan to replace the failing cables in the early morning of Wednesday, April 30th, at off-peak hours to minimize disruptions. We will provide a time for this in the coming hours. We apologize for any inconvenience this incident has caused.

  • Identified
    Identified

    Our network team is investigating deeper, but we can confirm that one of our core spine switches flapped all LACP interfaces. Physical interfaces remained online.

    The flapping of the LACP interfaces caused some connections between our top-of-rack switches and carriers to flap that were connected to said spine switch. More info will be posted soon.

  • Investigating
    Investigating

    We are currently investigating this incident and will report back once we have more details.

Hosturly - Legacy CHI-P-VPS-1 Hardware Failure
  • Resolved
    Resolved

    CHI-P-VPS-1 is now fully operational following the successful installation of a new motherboard. All virtual machines are online and functioning as expected. This incident is now considered resolved. As this event qualifies for SLA credit, we have proactively credited affected accounts with three months of additional service free of charge. This exceeds our SLA requirements, and we’ve done so as a gesture of goodwill and to reaffirm our commitment to providing reliable service and going above and beyond for our customers. We appreciate your patience and understanding.

  • Update
    Update

    A technician has replaced the suspected failed hardware. Unfortunately, the replacement is showing the same signs of failure. Due to this being legacy hardware, we have scaled down our backups as we no longer use these systems in any other production environment. Our systems team has ordered the replacement part and is expected to be delivered tomorrow, May 1st, 2025. Upon delivery, we will perform another replacement.

  • Identified
    Identified

    Our team has concluded that this is due to hardware failure. We are currently awaiting a technician to replace the motherboard and get this back in production. We will provide updates as soon as possible.

  • Investigating
    Investigating

    At 19:14 UTC, our monitoring systems have detected an outage on one of our legacy CHI-P-VPS-1 machines. Our team is currently investigating.

Infraly - London - Outage
  • Resolved
    Resolved

    Traffic has been stable for several days now. As a result, we will be marking this as resolved. We very much appreciate your understanding and apologize for any inconvenience this incident may have caused.

  • Monitoring
    Monitoring

    Services have been stable and online after the facility completed changes on our fiber connections. We will continue to monitor.

  • Update
    Update

    We're still working with datacenter staff on-site. We will provide an update ASAP.

  • Investigating
    Investigating

    We are currently investigating an issue in our London location this morning. DC engineers are already working on this.

  • Resolved
    Resolved

    Traffic has been stable for 12+ hours. As a result, we will be marking this as resolved. We very much appreciate your understanding and apologize for any inconvenience this incident may have caused.

  • Monitoring
    Monitoring

    Following an investigation with the datacenter manager on-site, we have concluded this to be a bad patch panel box that contains all of our fiber connections from carriers.

    In light of this finding, the datacenter has replaced the patch panel box and all optics connected to our core devices. We hope this will resolve any outages we have experienced today. We will continue to monitor over the next 24 hours. If this does recur, the datacenter has reassured us that there will be technical staff on-site who will be able to take actions to bring connections back up.

  • Update
    Update

    We have detected another drop in our London facility. The datacenter manager is continuing to work on this and doing tests now that this second drop has occurred unexpectedly. We will provide an update shortly.

  • Update
    Update

    Service was restored just a few minutes ago after the datacenter completed work on their end. We are currently awaiting information from them and are investigating with our own systems.

  • Update
    Update

    Our inquiry with the facility is being handled directly with the datacenter site manager. We will provide more information as soon as possible.

  • Update
    Update

    We are actively communicating with the facility in London, and this incident is marked in their systems as a high-priority 1 issue. We will provide more information as soon as possible.

  • Investigating
    Investigating

    We are currently investigating this incident. It appears to be an issue at the DC itself. Currently awaiting communications from them.

Mar 2025

Physgun - General Maintenance – March 26th, 2025
  • Completed
    March 26, 2025 at 4:28 PM
    Completed
    March 26, 2025 at 4:28 PM

    The machine is back online. We will continue to monitor. You should now be able to control your game servers via the control panel. If you have any questions or concerns, reach out to support! :)

  • Update
    March 26, 2025 at 4:26 PM
    Update
    March 26, 2025 at 4:26 PM

    The machine has been upgraded. The system is now booting.

  • In progress
    March 26, 2025 at 4:00 PM
    In progress
    March 26, 2025 at 4:00 PM
    Maintenance is now in progress
  • Update
    March 26, 2025 at 4:00 PM
    Update
    March 26, 2025 at 4:00 PM

    This has been changed to begin at 16:00 UTC to better allow the on-site technician proper time to get prepared.

  • Planned
    March 26, 2025 at 4:00 PM
    Planned
    March 26, 2025 at 4:00 PM

    Dear user,

    Please refer to a very important maintenance announcement that may have an impact on hosting services:

    Physgun - General Maintenance – March 26th, 2025

    Services Affected: CHI-S-GAME-2
    Start Date: March 26th, 2025 @ 16:00 UTC
    Estimated End Date: March 26th, 2025 @ 16:30 UTC

    Summary: Our team will perform upgrades to CHI-S-GAME-2 to further improve performance, reliability, and capability.

    Impact on Customer: Game servers on CHI-S-GAME-2 will be powered down as we will be deracking the machine and upgrading the components. Once upgraded, game servers will be controllable via the game panel. To find out if you are on this machine, please refer to the game panel.

    Updates: We will provide updates via our status page throughout the maintenance. You can subscribe for alerts on our status page (https://status.infraly.co).

    If you have any questions, don't hesitate to contact our client relations team via support ticket. Thank you again for your cooperation and support!

    Sincerely,

    Infraly, LLC DBA Hosturly, Physgun, WISP, & Buildurly
    a: 1636 N Cedar Crest Blvd, #122, Allentown, PA 18104, USA
    e: hello@infraly.co
    p: +1 (833) INF-RALY
    w: infraly.co / hosturly.com / physgun.com / wisp.gg / buildurly.com

WISP – General Maintenance – March 22nd, 2025
  • Completed
    March 22, 2025 at 8:00 PM
    Completed
    March 22, 2025 at 8:00 PM
    Maintenance has completed successfully
  • In progress
    March 22, 2025 at 7:00 PM
    In progress
    March 22, 2025 at 7:00 PM
    Maintenance is now in progress
  • Planned
    March 22, 2025 at 7:00 PM
    Planned
    March 22, 2025 at 7:00 PM

    Dear user,

    Please refer to a very important maintenance announcement that may have an impact on hosting services:

    WISP - General Maintenance – March 22nd, 2025

    Services Affected: WISP Front & Back-end Services
    Start Date: March 22nd, 2025 @ 19:00 UTC
    Estimated End Date: March 22nd, 2025 @ 20:00 UTC

    Summary: Our team will perform changes to the infrastructure of WISP to further improve performance, reliability, and capability.

    Impact on Customer: We do not anticipate disruptions; however, we have scheduled this out of an abundance of caution and transparency. Please note that game servers are not affected - WISP daemons will continue to operate.

    Updates: We will provide updates via our status page throughout the maintenance. You can subscribe for alerts on our status page (https://status.infraly.co).

    If you have any questions, don't hesitate to contact our client relations team via support ticket. Thank you again for your cooperation and support!

    Sincerely,

    Infraly, LLC DBA Hosturly, Physgun, WISP, & Buildurly
    a: 1636 N Cedar Crest Blvd, #122, Allentown, PA 18104, USA
    e: hello@infraly.co
    p: +1 (833) INF-RALY
    w: infraly.co / hosturly.com / physgun.com / wisp.gg / buildurly.com

Infraly - Chicago - Preparation for edge0 Replacement
  • Completed
    March 18, 2025 at 4:21 PM
    Completed
    March 18, 2025 at 4:21 PM

    Our network team is hands-off for the day. No disruption occurred. We will be posting a maintenance post for when we anticipate replacing edge0 completely. :)

  • In progress
    March 18, 2025 at 2:30 PM
    In progress
    March 18, 2025 at 2:30 PM
    Maintenance is now in progress
  • Planned
    March 18, 2025 at 2:30 PM
    Planned
    March 18, 2025 at 2:30 PM

    Dear user,

    Please refer to a very important maintenance announcement that may have an impact on hosting services:

    Preparation for edge0 Replacement – March 18th, 2025

    Services Affected: Chicago, Illinois Data Center
    Start Date: March 18th, 2025 @ 14:30 UTC
    Estimated End Date: March 18th, 2025 @ 18:30 UTC

    Summary: Preparing for the replacement of edge0, one of our routers that was deprioritized from traversing traffic in a previous maintenance post due to slowly dying resulting in infrequent blips.

    Impact on Customer: During this time, our network team will be applying changes to our network core to prepare for the replacement of edge0. Please note that there is an expected blip to occur at least once during this maintenance.

    Updates: We will provide updates via our status page throughout the maintenance. You can subscribe for alerts on our status page (https://status.infraly.co).

    If you have any questions, don't hesitate to contact our client relations team via support ticket. Thank you again for your cooperation and support!

    Sincerely,

    Infraly, LLC DBA Hosturly, Physgun, WISP, & Buildurly
    a: 1636 N Cedar Crest Blvd, #122, Allentown, PA 18104, USA
    e: hello@infraly.co
    p: +1 (833) INF-RALY
    w: infraly.co / hosturly.com / physgun.com / wisp.gg / buildurly.com

Infraly - Global - Path-Routed Services - Packet Loss
  • Resolved
    Resolved

    At 19:48 UTC on March 16th, 2025, we received the all-clear from Path that GTT had completed their maintenance. Since then, there have been no issues with connections. We will continue to monitor as always.

  • Update
    Update

    Path has notified us that one of their upstreams, GTT, is performing emergency maintenance to hopefully correct the issues previously mentioned in this incident post. This maintenance will begin at 15:45 UTC today and is expected to end at 19:45 UTC. Please note that there may be a blip in connectivity for Path-routed services that traverse the PoPs undergoing maintenance.

  • Update
    Update

    Path has notified us that one of their upstreams, GTT, is performing emergency maintenance to hopefully correct the issues previously mentioned in this incident post. This maintenance will begin at 6:00 UTC today and is expected to end at 7:00 UTC. Please note that there may be a blip in connectivity for Path-routed services that traverse the PoPs undergoing maintenance.

  • Identified
    Identified

    We are aware of issues currently with Path-routed services worldwide. We are currently in communication with them as this is outside of our control. Please note that no protection offering is perfect when not controlled by us: Path and Neoprotect both encountered similar issues today.

Feb 2025

Infraly - Chicago - Addressing Frequent Blips
  • Completed
    February 28, 2025 at 11:00 PM
    Completed
    February 28, 2025 at 11:00 PM
    Maintenance has completed successfully
  • Update
    February 28, 2025 at 1:50 AM
    Update
    February 28, 2025 at 1:50 AM

    Maintenance for this has been completed today. We've found the root cause to these Layer 2 issues relating to the router appliance itself. Luckily we have built the network to be redundant, so we will be shifting traffic over to a working router while we work on getting this defective one replaced.

    Again this maintenance will continue to take place at 9:00 AM Central time to avoid dropping players in the peak hours of the day. In the mean time some changes have been made to lessen the effects of these spikes.

    To clarify, we would've had this done today, however the backup router was still in the process of being setup and was paused while on-site was being developed. We needed a few prerequisites completed from our upstream before we could shift any traffic onto it. Which is why we are continuing this tomorrow as it went too far into prime time today to justify dropping traffic.

  • Update
    February 27, 2025 at 8:33 PM
    Update
    February 27, 2025 at 8:33 PM

    We are pushing some changes, you may notice a slight interruption.

  • In progress
    February 27, 2025 at 3:00 PM
    In progress
    February 27, 2025 at 3:00 PM
    Maintenance is now in progress
  • Planned
    February 27, 2025 at 3:00 PM
    Planned
    February 27, 2025 at 3:00 PM

    Our network team has identified the root cause of the frequent short drops that have plagued the network over the past few days. We understand the severity of these drops and have identified the root cause. To permanently resolve these issues, we will be conducting emergency maintenance at 9:00 AM Central Time. During this maintenance, you will experience brief disruptions as mass changes will be done. We apologize in advance for any inconvenience this may pose to you, especially over these past few weeks where we have suffered instability from one of our upstream providers as well as the network maintenance we conducted to upgrade our core late last month. To be frank, the timing could not have been worse.

    For transparency, the issue stems from a Layer 2 issue inside our EVPN-VXLAN network, which is affecting our spine switches that process essentially all traffic on our network. As a result, this was felt widespread and not just related to one upstream or one cabinet. This issue appears to have sprung from the preparation of onboarding our on-prem protection suite into our core. We have been working at a fast pace to get that online and operational in hopes of shifting all traffic over in order to provide stability.

    We know the past few weeks have been difficult, and we recognize the importance of a reliable network for our customers and are tirelessly working to improve our offerings.

Infraly - Chicago - More Progress With On-Site Protection
  • Completed
    March 01, 2025 at 3:00 PM
    Completed
    March 01, 2025 at 3:00 PM
    Maintenance has completed successfully
  • Update
    February 25, 2025 at 10:44 PM
    Update
    February 25, 2025 at 10:44 PM

    We have completed maintenance for today, this extension saw no external loss to production switches. We have made a lot of real, meaningful progress today. We are around the home stretch now, simply a few things to tidy up before we push more live traffic to onsite!

    We will be continuing our work again tomorrow at 9:00 AM Central to avoid any potential interruptions during peak hours.

  • Update
    February 25, 2025 at 7:36 PM
    Update
    February 25, 2025 at 7:36 PM

    Hello everyone, apologies for the short notice but we will be extending the previous maintenance for a few more hours.

    Why? Because today we’ve made some crazy good progress, and we think onsite can realistically be done very soon. We everything is online we even have some live traffic being pushed to it.

    To iterate again, this will be the solution for us to attempt to seamlessly move traffic from the global upstream to our localized mitigation stack when they have issues. Effectively keeping uptime with as little to no drops as possible.Thank you for bearing with us, we will send out some cool pictures soon

  • In progress
    February 25, 2025 at 3:00 PM
    In progress
    February 25, 2025 at 3:00 PM
    Maintenance is now in progress
  • Planned
    February 25, 2025 at 3:00 PM
    Planned
    February 25, 2025 at 3:00 PM

    At specifically 9AM Central Time we will be continuing development with our onsite network. We apologize for any interruptions this may cause, we are doing this early in the AM to ensure we impact as little traffic as possible.

    We understand the frequent issues from upstream isn't making this an easy pill to swallow, but we must continue work on this to ensure we are independent from future network issues once Onsite goes live.

    To give context on what onsite will bring for those who may have missed it:

    Infraly Onsite DDoS Protection will allow us to have a localized Path environment that will be isolated from the global network. This will allow us to attempt to seamlessly, without dropping traffic move between the global network and local network when needed.

    Take for example the issues that we have been facing now, these are all from the global network with Onsite we would be-able to push traffic onto our local mitigation stack, effectively isolating us from global network issues, ensuring full uptime. This also works in reverse, if the local network was to go offline for some reason, we would route back onto the global network, while again attempting to not drop any traffic.

    This system is extremely complex, and has been under development for a while now, we are speeding up progress but also doing so at the least impactful times, we understand no downtime is ideal, however this must be done in order to ensure we have a fully redundant network. I am sure everyone is tired of these upstream issues, we are too, and we truly believe onsite is the solution we are all looking for.

Physgun – Emergency Maintenance on LON-S-GAME-1 – February 23rd, 2025
  • Completed
    February 23, 2025 at 9:35 PM
    Completed
    February 23, 2025 at 9:35 PM

    This has been completed successfully. All servers on LON-GAME-1 should be back up and running. We sincerely apologize for the inconvenience this may have caused.

    As mentioned previously, we will be providing SLA credit to all clients affected. Please open a ticket on the billing site if your game server was affected by this. We will verify and then credit accordingly.

  • In progress
    February 23, 2025 at 6:50 PM
    In progress
    February 23, 2025 at 6:50 PM
    Maintenance is now in progress
  • Planned
    February 23, 2025 at 6:50 PM
    Planned
    February 23, 2025 at 6:50 PM

    Dear user,

    Please refer to a very important maintenance announcement that may have an impact on hosting services:

    Emergency Maintenance on LON-S-GAME-1 – February 23rd, 2025

    Services Affected: Physgun's LON-S-GAME-1
    Start Date: February 23rd, 2025 @ 18:50 UTC
    Estimated End Date: February 23rd, 2025 @ 22:50 UTC

    Summary: We have identified a critical issue on LON-S-GAME-1 and need to perform updates and migrations to ensure stability for the machine.

    Impact on Customer: During the maintenance, users on LON-S-GAME-1 will experience a service disruption. Due to the short notice of this maintenance, we are offering SLA credit for this. More details will come for this later.

    Updates: We will provide updates via our status page throughout the maintenance. You can subscribe for alerts on our status page (https://status.infraly.co).

    If you have any questions, don't hesitate to contact our client relations team via support ticket. Thank you again for your cooperation and support!

    Sincerely,

    Infraly, LLC DBA Hosturly, Physgun, WISP, & Buildurly
    a: 1636 N Cedar Crest Blvd, #122, Allentown, PA 18104, USA
    e: hello@infraly.co
    p: +1 (833) INF-RALY
    w: infraly.co / hosturly.com / physgun.com / wisp.gg / buildurly.com

Feb 2025 to Apr 2025

Next